Mumbai’s first underground Metro Aqua Line 3, connecting Aarey and BKC, was unveiled on Tuesday, September 24. The initial phase of the Metro Aqua Line 3, spanning from Aarey to BKC, is set to commence operations on October 4, though it may initially exclude the two airport stations. The 33.5 km Colaba-Bandra-SEEPZ Metro-3 Corridor, featuring 26 underground stations, is a pivotal project aimed at enhancing the city’s transportation network. The Mumbai Metro Aqua Line 3 will integrate with the suburban railway, other Mumbai Metro lines, and existing transport modes at approximately eight locations, including major rail terminals like Mumbai CSMT and Churchgate. Mumbai Metro Aqua Line 3 To Start From July 24, Says MyGovIndia on X; Then Deletes Post.
Mumbai Metro Line 3 First Look
FIRST RIDE! Mumbai's first underground Metro Aqua Line 3. Let's take a ride. The platform is three floors down. pic.twitter.com/VHWKRkKJru
— Rajendra B. Aklekar (@rajtoday) September 24, 2024
Sneak Peek Inside Underground Metro Aqua Line 3
First look! Metro-3 trial run from BKC to Aarey.
1. This is the platform at BKC station
2. Train passes Santacruz
3. Doors of trains and platform screens will open & shut every 20-30 seconds.
4. The coaches seem to be a bit wider having steel seats@htTweets @MumbaiMetro3 pic.twitter.com/QL3a5kVOJh
— Shashank Rao (@Shashankrao06) September 24, 2024
(SocialLY brings you all the latest breaking news, viral trends and information from social media world, including Twitter (X), Instagram and Youtube. The above post is embeded directly from the user's social media account and LatestLY Staff may not have modified or edited the content body. The views and facts appearing in the social media post do not reflect the opinions of LatestLY, also LatestLY does not assume any responsibility or liability for the same.)