⚡SLBC Tunnel: Operation Intensified To Trace Six Missing Persons in Telangana Tunnel
By IANS
The operation is said to have entered the final stage in SLBC Tunnel, while restoration of the loco track till the 13.88 km point is being sped up. It was on February 22 that a portion of the tunnel's roof collapsed, trapping eight workers.