India News | Ken-Betwa River Linking Project Poses Serious Threat to Panna Tiger Reserve: Cong

Get latest articles and stories on India at LatestLY. The Congress on Wednesday said that by laying the foundation stone of the Ken-Betwa River Linking Project, Prime Minister Narendra Modi will give another proof of the difference between his "talk and walk" on environment as it poses a serious threat to the Panna Tiger Reserve.

New Delhi, Dec 25 (PTI) The Congress on Wednesday said that by laying the foundation stone of the Ken-Betwa River Linking Project, Prime Minister Narendra Modi will give another proof of the difference between his "talk and walk" on environment as it poses a serious threat to the Panna Tiger Reserve.

Modi will lay the foundation stone of the project, the first such initiative under the national river interlinking policy, at Khajuraho in Madhya Pradesh on Wednesday.

Also Read | Kolkata Fatafat Result Today: Kolkata FF Result for December 25, 2024 Declared, Check Winning Numbers and Result Chart of Satta Matka-Type Lottery Game.

"Today the PM is giving one more evidence of the difference between his 'talk' and 'walk' on environment and forest matters. The Ken-Betwa river linking project for which he is laying the foundation stone today poses a serious threat to the biodiversity-rich Panna Tiger Reserve in Madhya Pradesh," Congress general secretary in-charge communications Jairam Ramesh said in a post on X.

Panna is the most remarkable success story of revival as by early 2009 its tiger population had been completely wiped out. Thanks to the tiger reintroduction programme launched 15 years ago, India's first, presently Panna has around 90-plus tigers, including cubs and sub-adults, and is thriving with sustainable tourism-based livelihoods, the former environment minister said.

Also Read | Shillong Teer Results Today, December 25 2024: Winning Numbers, Result Chart for Shillong Morning Teer, Shillong Night Teer, Khanapara Teer, Juwai Teer and Jowai Ladrymbai.

The project will submerge over 10 per cent of the core area of the tiger reserve, he said.

"Not only prime tiger habitats - but also those of other species like vultures - will be lost. The ecosystem will be bifurcated. More than 23 lakh trees are to be felled. Construction activities will be a severe disturbance," he added.

Ramesh further said that three cement factories are being planned and one has already been commissioned in the vicinity of the park. There are questions on the basic assumptions on surplus water itself.

"What is unfortunate is that there are alternatives for executing the project (like locating the dam upstream) without causing such extensive ecological damage," the Congress leader said.

Under the project, a 77-metre-high and 2.13-kilometre-long Daudhan dam and two tunnels (upper level 1.9 km and lower level 1.1 km) will be constructed on the Ken river in the Panna Tiger Reserve.

(This is an unedited and auto-generated story from Syndicated News feed, LatestLY Staff may not have modified or edited the content body)

Share Now

Share Now